Scope of Work
Cianbro is constructing three, GE 1.5 MW wind turbines in the town of Vinalhaven, located on Vinalhaven Island.
Project Details
Cianbro is:
- Providing support to the owner through permitting, engineering and procurement of the turbines
- Erecting three, GE 1.5 MW wind turbines, including tower sections, nacelle, hub, and blades
- Clearing the site
- Constructing the site road
- Placing the concrete foundations
- Installing the collection and interconnect system
- Installing the SCADA and communications system
Unique Challenge
Cianbro is constructing the wind turbines on Vinalhaven Island approximately 12 miles off the coast of Maine. The location of the project requires all construction materials and equipment to be barged to the island. In order to transport the 18 erection crane loads, 27 turbine loads, 30 concrete loads, and all the construction material and equipment to the project site requires precise logistics, including; scheduling and coordination with the owner, vendors, and marine transportation companies to ensure all material is transported in the most cost effective and safest way possible. Due to the size of Vinalhaven Island and how its economy depends on fishing and summer tourism, Cianbro will work closely with the community to mitigate any impacts that may arise during construction.