Wednesday, September 20, 2017


  


Resources
Over 250 Multi-Skilled Pipe Fabricators
Pipe Positioning Equipment
Miller PipePro™ RMD Dual Spool Welders
Cost Estimating
Stringent Material / Inventory Control Systems
Dedicated Project Managers

Technology
Spoolgen® Pipe Detailing Software
Materials Tracking & Positive Materials Identification (PMI)
AutoCAD®
ASME Pressure Vessel Design Capabilities
Automated Pipe Preparation & Welding Machines
Orbital Welding

Safety
Full Time Onsite Safety Professionals
Daily Activity Planning / Hazard Analysis
Weekly Training Meetings
Regular Safety Committee Meetings

Weld Processes
GTA
SMAW
FCAW
GMAW (including RMD)
SAW
Orbital GTAW
Orbital FCAW
Induction Heat Treatment

Coating Capabilities
Specialty Coatings
Airless & Plural Component Spray Equipment
100% Solids / Ceramic
LEED Certified Capabilities
Quality
Full Time Onsite Quality Inspectors:
- NDE Level III & II in UT, MT and PT
- AWS – CWIs
- NACE Level III
- In-House Phased Array UT
- Capable of Full Radiography Onsite (Subcontracted)
- In-House Hardness & Ferrite Testing and
Positive Material Identification (PMI)
- 100% Dimensional Verification at Fit-Up
- Complete Material Receiving Inspection & Verification
Welding Program (Procedures & Team Members)
in accordance with:
- ASME Section IX
- AWS D1.1 & D1.5
- API 1104
Construction in accordance with ASME codes:
- B31.1 (Power Piping)
- B31.3 (Process Piping)
COATING HARDNESS TESTING HEAT TREATING
- Section I (Power Boilers)
- Section VIII (Unfired Pressure Vessels)
Industry Certifications:
- ASME U & S, National Board R & NB
- SSPC QP-1 & QP-2
- AISC STD, SBR, CBR, SPE
Full Hydrostatic or Pneumatic Testing In-House 

  

Markets

Nuclear 
Petrochemical
Mining / Processing
Pharmaceutical
Oil & Gas
Power & Energy
Water Treatment

Download Brochure

Copyright 2013 by The Cianbro Companies Contact Us | Plan Room Vendors & Suppliers  | Privacy Statement | Terms Of Use
  
2013 by Cianbro Corporation