Wednesday, February 22, 2012
Cianbro offers construction services from the conceptual stages of design through implementation, to start-up, commissioning, and turn-key operations. Cianbro’s versatility can be attributed to a vast service territory throughout the United States, effectively demonstrated by the diverse nature of completed projects. Cianbro’s success can be credited directly to the team’s attitude towards working safely, with enthusiasm, and a genuine concern for clients. Skill and experience possessed by Cianbro’s team members cover the complete spectrum of construction trades.

Cianbro self-performs Civil, Structural, Mechanical, Electrical, Instrumentation, Fabrication, and Coating, in twelve different markets, throughout the United States. Performing services under various contractual methods and in several different capacities, Cianbro has experience in Construction Management, Design-Build, and Engineer Procure Construct (EPC), in addition to Conventional Design-Bid-Build. Cianbro continues to be selected as a Prime/General Contractor and Joint Venture/Partner, but has also served as a Construction Manager, Subcontractor, Fabrication Supplier, and Consultant for construction services.
  
Current Projects
Sort by: Project Title | Type | Location | Status
Image

Prefabricated Electrical Buildings (E-Rooms)
Cianbro will design and supply 11 - single story, 9 - two story, and 2 - three story prefabricated electrical buildings completely built, furnished and tested. More...

Project Type: Mining/Processing | Location: NNE | Status: Current

Image

Brightman Street Bridge Replacement
Cianbro/Middlesex Joint Venture is constructing the approach span and bascule span superstructure.More...

Project Type: Highway - Moveable | Location: SNE | Status: Current

Image

Humpback Bridge Replacement
Cianbro is constructing the replacement of the Humpback Bridge over Boundary Channel, including the addition of an acceleration lane to alleviate traffic backups on existing ramps and the 14th Street Bridge in Washington, DC. More...

Project Type: Highway - Fixed | Location: MAR | Status: Current

Image

Pennington Avenue Bascule Bridge Rehabilitation
Cianbro is rehabilitating the Pennington Avenue Bridge over Curtis Bay, on the Patapsco River. More...

Project Type: Highway - Moveable | Location: MAR | Status: Current

Image

Galveston Causeway Railroad Bridge
Cianbro, along with Joint Venture Partner Brasfield & Gorrie, is constructing a new vertical lift span bridge adjacent to the existing, single-track bridge. More...

Project Type: Rail - Moveable | Location: MAR | Status: Current

Image

Bates Bridge
Cianbro is reconstructing the nearly century old, single leaf bascule Bates Bridge over the Merrimack River, restructuring the roadway approaches, and reconfiguring two intersections. More...

Project Type: Highway - Fixed | Location: SNE | Status: Current

Image

Mystic River Bascule Bridge Rehabilitation
Cianbro is rehabilitating the structural steel, electrical, machinery, control house systems and realignment of the Mystic River Bascule Bridge, originally built in 1922. More...

Project Type: Highway - Moveable | Location: SNE | Status: Current

Image

Niantic River Bascule Bridge Replacement
The Cianbro/ Middlesex Joint Venture Team is constructing a new two-track, electrified railroad bascule bridge across the Niantic River 58 ft south of its present location. More...

Project Type: Rail - Moveable | Location: SNE | Status: Current

Image

Little Bay Bridge Construction
Cianbro is constructing a nine span, 1,639 ft bridge carrying two northbound and southbound lanes of the Spaulding Turnpike over Little Bay. More...

Project Type: Highway - Fixed | Location: NNE | Status: Current

Image

Bangor Event Center
Cianbro is the Construction Manager for the new 202,257 sf steel framed Arena and Convention Center with a maximum seating capacity of approximately 8,000. More...

Project Type: Recreation | Location: NNE | Status: Current

Image

C&O Canal Big Slackwater Towpath Stabilization
Cianbro is reconstructing approximately 8,000 lf (1.5 miles) of the historic Chesapeake & Ohio Canal Towpath. More...

Project Type: Shoreline Structures | Location: MAR | Status: Current

Image

Maine Power Reliability Project The Central Loop
Cianbro and Irby Construction are constructing/upgrading 230 miles of transmission line. More...

Project Type: Transmission Line | Location: NNE | Status: Current

Image

East and West Harbor Bridge Replacements – Stonington
Cianbro is replacing two fixed, simple span, thru-girder rail bridges. The railway consists of two ballasted tracks on the same alignment located on a causeway, with low clearance over harbor channels approximately 800 feet apart. More...

Project Type:  Rail - Fixed | Location: SNE | Status: Current

Image

Howland Piscataquis Bridge
The Cianbro team is the design-builder for the design and construction a new 582 ft bridge over the Piscataquis River. More...

Project Type: Highway - Fixed | Location: NNE | Status: Current

  

Markets












Copyright 2011 by The Cianbro Companies Contact Us | Plan Room Vendors & Suppliers  | Privacy Statement | Terms Of Use
  
by Cianbro Corporation