Scope of Work
Cianbro completed 5 projects for Franklin Memorial Hospital including pre-construction, construction management and self-performance of critical work activities following a fire event. Work was performed within occupied spaces as well as isolated areas while adjacent hospital services remained in operation. Cianbro worked with the owner, architect/engineer, insurance representatives, and third party inspection engineers to plan and expedite the work for minimal impact to ongoing hospital operations, patient care and visitors.

Project Details
  • Provided emergency stabilization and weather protection enclosures for the structure and roof to ensure a watertight condition
  • Provided constructability and planning for the path forward
  • Worked with project stakeholders to develop a plan to replace the failed roof structure
  • Assisted the architect/engineer to incorporate the emergency stabilization into the final structure to save the owner time and costs 
  • Performed smoke odor mitigation of the remaining structure
  • Provided pre-construction and construction management services to fully demolish and rebuild the first and second floor fire damaged space 
  • Performed code repairs to the existing 42,000 sf west wing 
  • Performed pre-construction and construction management services to demolish the former HIM and HR space and construct the new Family Practice facility within the building
  • Self-performed the electrical and tel/data for the Family Practice facility
  

Unique Challenge



Cianbro worked closely with staff members to facilitate proper Infection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM).

Project Information

Owner:
Franklin Community Health Network 

Type of Project:
Healthcare

Construction Schedule:
Completed March 2011

Location:
Farmington, ME