National Harbor Piers
Scope of Work
Cianbro constructed a marina pier, a commercial pier, and a recreational pier at the National Harbor Complex. The marina pier was 660 lf with two large bump-outs 60 ft x 100 ft, with floating docks to accommodate the 75 ft boat slips for vessels up to 60 ft long. The commercial pier was 700 lf with one bump-out 60 ft x 60 ft with various floating docks to accommodate large commercial vessels and a winter taxi dock. The recreational pier was 425 lf with a large “T” Section 50 ft x 150 ft with various floating docks and two moorings to accommodate water taxis and watercraft.
Project Details
Drove 286, 18 inch concrete piles
Drove 81, 16 inch steel pipe piles for a 27,000 sf floating dock system
Placed 2,176 cy of concrete topping slabs
Set and grouted 145 precast concrete bent caps
Placed 215 precast 8 inch thick deck panels
Installed 17,400 sf of trench decking for the utility trench
Constructed two pencil structures for the bump-outs on the marina pier and another pencil structure for the “T” section of the recreational pier
Installed pipe pile for channel navigational markers designated by the US Coast Guard
Designed and built the tensile structure for the marina pier
Installed all electrical utilities in addition to sewer, water, phone, cable, and security systems
Installed all amenities on the project included benches, binoculars, trash receptacles, etc.
Unique Challenge
During construction, Cianbro worked on and adjacent to the Potomac River which is a tributary to the Chesapeake Bay and is included in the environmentally sensitive Chesapeake Bay Critical Area. To meet the standards of the Chesapeake Bay Critical Area, Cianbro implemented spill control measures and closed out the project with no environmental incidents
Project Information
Owner:
National Harbor Development, LLC
Type of Project:
Marine
Construction Schedule:
Completed March 2008
Location:
National Harbor, MD
Related Links
Equipment Fleet
Shipbuilding & Offshore
Fabrication & Coating
....
Copyright 2011 by The Cianbro Companies
Contact Us
|
Plan Room
Vendors & Suppliers
|
Privacy Statement
|
Terms Of Use
2012 by Cianbro Corporation
Terms Of Use
Privacy Statement
Login