Scope of Work
Cianbro provided complete EPC services for the engineering, procurement and construction of the 40MW wind farm. 

Project Details
  • Completed 6.5 miles of access roads including, 500,000 cy of excavation
  • Placed 13 WTG foundations, including 260 rock anchors
  • Transported over-width/over-weight turbine components from Searsport, Maine to the project site
  • Installed 13 Vestas V-112 turbines, including all erection, down-tower electrical, mechanical alignment, and commissioning support
  • ​Placed 5 miles of underground collector line, including communications and grounding
  • Placed 18 miles of overhead collector line, including 9 miles of new overbuild for the existing utility, and 9 miles of new cross country transmission and communication
  • Installed D-VAR system to ensure power quality at the grid connection to the 34.5kV collection substation
  • Constructed a 115kV switch yard, as well as perform 115kV transmission line tie-in and related outage coordination
  • Constructed an O&M building with station service, communications, oil storage, and security and erect a permanent MET tower and related instrumentation
  • Managed the commissioned of the entire generation facility

  

Project Information

Owner:
Quantum Utility Generation

Type of Project:
Power Generation & Energy

Construction Schedule:

Completed December 2015  

Location:
Lowell, ME