Mystic River Bascule Bridge Rehabilitation
Scope of Work
Cianbro is rehabilitating the structural steel, electrical, machinery, control house systems and realignment of the Mystic River Bascule Bridge, originally built in 1922.
Project Details
Blasting, cleaning, repairing and painting the structural steel
Jacking the counterweights to realign the counterweight truss
Replacing the counterweight trunnion bearings
Replacing the electrical systems including the main drive motors braking systems, controls, lighting, traffic signals, gates, and installing a stand-by generator
Replacing the drive machinery and realigning the main pinion and bull wheel bearings
Replacing the control house and the adjoining shed and motor houses
Removing and replacing 320 ft of submarine cable
Upgrading the fender system and installing scour monitor devices
Replacing the bridge railing on the east span and extending to the approaches on the north and south sides of the road
Repairing the stone wall and east abutment
Unique Challenge
The bridge is located within a historical downtown vacation destination. The rehabilitation of the bridge is being completed concurrently with and adjacent to a major streetscape expansion project. The bridge rehabilitation is phased over the course of three winters in an effort minimize any disruption to tourist season(s).
Project Information
Owner:
Connecticut Department of Transportation
Type of Project:
Transportation
Construction Schedule:
Start: December 2010
Complete: May 2013
Location:
Stonington & Groton, CT
Related Links
Complex Movable Bridges
Modular Bridge Manufacturing
Fabrication & Coating
Equipment Fleet
Transmission, Substation & Distribution
Copyright 2011 by The Cianbro Companies
Contact Us
|
Plan Room
Vendors & Suppliers
|
Privacy Statement
|
Terms Of Use
2012 by Cianbro Corporation
Terms Of Use
Privacy Statement
Login