Raven Farm 345 kV Site and Substation Construction

Location:
Cumberland, ME
Completed:
2012

Scope of Work

Cianbro performed all site development and substation construction, including managing all engineering, procurement and construction (civil, mechanical and electrical work) necessary for the EPC contract for a new 16 acre, 345 kV substation, as part of Central Maine Power’s Maine Power Reliability Program (MPRP).

Project Details

  • Stripped 7,412 cubic yards of topsoil
  • Removed 106,292 cubic yards of rock
  • Cut 43,699 cubic yards of material
  • Imported 65,175 cubic yards of material
  • Installed 141 foundations
  • Installed conduit and grounding
  • Erected 118 steel structures
  • Constructed a 90 feet by 40 feet control house and installed / outfitted all AC/DC equipment, cable tray, lighting, control cabinets, wiring, and terminations
  • Installed 345 kV yard equipment, including 4 circuit breakers, 14 disconnect switches, CCVT’s, lightning arresters, insulators, and other miscellaneous equipment
  • Fabricated and installed 3,100 linear feet of aluminum bus
  • Fabricated and installed 5,600 linear feet of flex taps
  • Pulled and terminated 39,500 linear feet of control and power cable
  • Installed all fiber optic cables

Lean, Innovative, and Unique Project Solutions

Cianbro coordinated all engineering activities and material / equipment procurement necessary to meet all construction milestone dates.