NRG Energy Center Dover Repowering

Location:
Dover, DE
Completed:
2013

Scope of Work

Cianbro installed and commissioned a new HRSG unit attached to an existing GE LM6000 PC gas turbine and an 18 MW GE auto extraction steam turbine. The project also included the installation and commissioning of a new 1,000 horsepower natural gas fired boiler.

Project Details

  • Installed the package boiler, economizer, and stack
  • Installed, tested, and insulated the package boiler piping and equipment
  • Installed a new pipe bridge
  • Removed existing simple cycle gas turbine stack and duct work silencer
  • Installed new HRSG modules, stack, and duct burners
  • Installed the HRSG steam drum, prefabricated piping, and liner plates
  • Installed the ammonia tank and piping for NOx catalyst
  • Welded heavy wall chrome piping with a 100% x-ray acceptance
  • Performed multiple two-crane lifts, up to 90 tons

Lean, Innovative, and Unique Project Solutions

Cianbro maintained an aggressive schedule, worked within limited and confined site access, while successfully performing two-crane lifts with no service interruptions during installation and commissioning.