34.5 kV Transmission Line Rebuild

Location:
Withheld Upon Owner Request
Completed:
2017

Scope of Work

Cianbro constructed a new 6-mile, 34.5 kV transmission line including the demolition of two existing substations.

Project Details

  • Installed Section 115 temporary bypass transmission line and 12 wood pole structures
  • Removed a portion of Section 115 permanent and temporary transmission line and 15 existing wood pole structures
  • Removed two existing substations
  • Installed 4 new drilled concrete foundations
  • Constructed 75 new wood pole structures
  • Installed 6 miles of 477 ACSR conductor
  • Installed 6 miles of ADSS fiber

Lean, Innovative, and Unique Project Solutions

The Cianbro team constructed a temporary bypass line to keep the existing transmission line energized during the construction of the new transmission line.