Scope of Work

Cianbro constructed a new 34.5 kV substation to an existing, energized 34.5 kV substation at an operating hydroelectric generation plant.

Project Details

  • Performed site clearing and grubbing
  • Installed concrete foundations
  • Installed the following substation components:
    • Foundations and double dead end and single end structures
    • Subsurface grounding and conduit systems
    • Transformer oil containment system
    • All substation equipment
  • Installed and welded the aluminum bus system
  • Installed and terminated the control cables and equipment taps
  • Installed distribution poles and lines outside substation
  • Performed final grading and site restoration

Lean, Innovative, and Unique Project Solutions

Cianbro adjusted the foundation design to accommodate pinning due to shallow ledge.