Scope of Work

Cianbro erected a 20 MW wind project with 10, 2 MW Gamesa wind turbines.

Project Details

  • Installed 10 rock anchor foundations
  • Provided all offloading, erection and down tower wiring services
  • Installed 7,000 feet of overhead transmission lines
  • Installed 7,000 feet of overhead distribution lines
  • Installed 2 miles of underground collection power lines and fiber network
  • Performed operations and maintenance
  • Constructed O&M Building

Lean, Innovative, and Unique Project Solutions

This ridgeline wind farm project was constructed on an accelerated schedule in which construction began in August and was commissioned / operating by December. Cianbro was selected by the Owner as a result of our self-perform capabilities on all aspects of the work and providing our client with collaboration and schedule certainty to avoid winter conditions.